If one looks closely at the track on the left, one will notice that it goes nowhere. It ends just before the Wood-Ridge station and the track hasnt been installed in the crossing to connect it to the Seamans lead on the other side of the crossing, yet the signal to protect it is installed and working. 10/5/2008 |