After setting the switch the crew of H76 rides on back up the 3.4% grade. In a few miles the grade will decrease to 2% and here the engineer will stop, then backup to allow crew in cab. |
Date:
9/22/2015 |
Location:
Portland, PA Map  |
Views:
79 |
Collection Of:

Ken Harbin |
Rolling Stock: |
Author: Ken Harbin
|
 |
Picture Categories: Scenic,RollingStock,Action |
This picture is part of album: Portland, PA Interchange 2015 |