WB action
Work train in WB siding, WB freight holds the main at the "W" (wait) signal, and the pickup to be made waits in the EB siding. Brakeman on the ground (EB main) heads back to make the cut.
Date:
4/15/1985
Location:
Truckee, CA
Views:
309
Collection Of:
Bruce Flaws
Locomotives:
SP 4417(SD9E)
Author:
Bruce Flaws
Picture Categories: Yard
This picture is part of album:
SP Truckee area pics from the 1980s
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=4953005