NYSW CL-X arrives in Syracuse, New York. The locomotives will do a runaround and push the train onto the Belle Isle Controlled Siding in Solvay, New York. The shove was not made until after sunset. 276 axles. |
Date:
12/3/2022 |
Location:
Syracuse, NY |
Views:
80 |
Collection Of:
Max Smith |
Locomotives: Rolling Stock: |
Author: Max Smith
|
|
Picture Categories: Roster,Scenic,RollingStock,Yard,Action |
This picture is part of album: Restored Album |